Nov 23, 2024  
2020-2021 Catalog 
    
2020-2021 Catalog [ARCHIVED CATALOG]

WELD 1774 - Gas Metal Arc Welding Pipe


Credits: 3
The student will learn the techniques necessary to create full penetration welds on schedule 40 carbon steel pipe in all positions using the Gas Metal Arc process with ER70S filler metal with a 75/25 Argon/CO2 shielding gas.

Prerequisite: WELD 1770